Lane closings for road repair on Hwy 50 & North Shore Dr.

Schultz Construction is setting up their traffic control on Highway 50 starting today (April 25th), for planned work to repair two spots of failed concrete pavement.  Geneva Street (Highway 50), will be restricted to  a single lane in each direction, between North Shore Drive and the northbound Interstate ramps.

The concrete pavement repair work will also take place for the westbound right turn lane at North Shore Drive (by Chili’s), which will require closing of one of the eastbound left turn lanes.  Prior to closing the westbound right turn lane at North Shore Drive, the contractor is required to post advance notice east of the entrance into Delavan Crossings by F &F Tire for traffic to enter the commercial area at that location.

You may also like...

Translate »